Septic System Information

The Engineering Division of the Department of Public Works serves as Agents to the Board of the Health on all septic related issues.  Please call the Assistant Town Engineer to schedule an appointment. Percolation tests and deep hole witness must be scheduled at least 48 hours in advance. Inspections must be schedule at least 24 hours in advance.

The local superseding regulations to 310 CMR 15.00 (Title V)  can be found in the Town of Sharon Codification, Division 2: Regulations, Chapter 300: Board of Health Regulations, Article 7: Minimum Requirements for Subsurface Disposal of Sanitary Sewage.

Staff Contacts

Name Phone
Kevin Davis (781) 784-1525 ext. 2317
Feed